This project was initially a feasibility study that went through the referendum process. After successfully passing the referendum and programming meetings with fire hall volunteers and district staff, the new Lavington Fire Hall was designed to replace the existing fire hall, an aging and undersized facility in the same location. The color scheme for the new building was designed to complement the existing adjacent elementary school and blend in with its surroundings.
© 2024 MQN Architects Privacy Policy
100 – 3313 32nd Ave V1T 2M7 Vernon, BC
© 2024 MQN Architects Privacy Policy
Vernon, British Columbia
100 – 3313 32nd Ave V1T 2M7
[email protected] 250-542-1199